On versions 15.0.0-15.1.0.1, 14.1.0-14.1.2.3, and 13.1.0-13.1.3.3, when the BIG-IP Virtual Edition (VE) is configured with VLAN groups and there are devices configured with OSPF connected to it, the Network Device Abstraction Layer (NDAL) Interfaces can lock up and in turn disrupting the communication between the mcpd and tmm processes.
CVSS Details
- CVSS 3.1 Base Score: 7.5
- CVSS 3.1 Vector: (CVSS:3.1/AV:N/AC:L/PR:N/UI:N/S:U/C:N/I:N/A:H)
Covered by Rapid7
| Product | Vendor Advisory | Solution File | Added | Published |
|---|---|---|---|---|
| F5 Big Ip | — | Update F5 BIG-IP to the latest version | Jun 17, 2026 | Apr 30, 2020 |
Prioritise with Active Threat Intelligence
With curated Threat Intelligence, you can see which vulnerabilities truly put you at risk, prioritize what matters most, and act before attackers do.
Explore Intelligence Hub